Run record R-20261113-bau-1
Foundry's first build run on Navigo Bau to reach a merge, 13 November 2026: one requirement, from the plan to a merged pull request in 101 minutes, with 13 agent rounds, 16 checks and $5.19 at API prices. It was a small piece of work: 4 builder rounds of 17 to 64 seconds, 2 of them on fix tasks from the review, and 2 of its 3 acceptance tests were already met before the build, by a fix shipped earlier that day.
Taken from the run's own files, with the numbers kept and all text, names and paths removed. G1.F1.T2 means goal 1, feature 1, task 2. Times are UTC.
- a3.3 min: test writer, the longest round
- b40.6 min: acceptance red, green on a re-run at 46.1
- c47.5 min: review red: 2 fix tasks
- d66.2 min: background red 3×, no task blamed
- e101.4 min: gate two, I approved the merge
Gate one, the plan: 1.0 to 1.8 min, approved for me by a Claude session. Agent rounds: 13; the longest, the test writer's, ran 3.3 to 9.8 min. Checks: 16, 2 red (the acceptance check at 40.6 min, the feature review at 47.5 min); on the run's path they took 73 minutes. Background suite: red at 66.2, 87.8, 93.8 min. Gate two, the merge: 89.3 to 101.4 min, approved by me at a terminal. Every mark is a row in the table below.
- product
- Navigo Bau, one requirement
- started
- 2026-11-13 14:36:50
- ended
- 2026-11-13 16:18:17
- stop reason
done, merged once I approved it- wall time
- 101 minutes, plan to merge
- rounds
- 13: planner 1, test writer 1, builder 4, blame 4, reviewer 3
- time
- checks 73 minutes, agent rounds 15, waiting at the two gates for a decision 13, the foreman's own steps (room, pull request, merge) under 1
- cost
- $5.19 at API prices
- cost by role
- planner $0.34, test writer $2.31, builder $0.57, blame $0.13, reviewer $1.84
How the time is split: a span of the run counts as agent time while a round is open, as waiting while a gate is open, and as check time from the step before a check to its result (install, task tests, acceptance tests, the goal's suite and CI). The background suite runs beside the run and is not counted. Costs are the Agent SDK's figures at API prices.
Every event, in order
Rounds stand at their start, checks at their result. Cost updates and the building and checking marks of each node are left out. A small number points to a note under the table.
| UTC | min | event | node | detail |
|---|---|---|---|---|
| 14:36:50 | 0.0 | run: started, the plan is being made | ||
| 14:37:06 | 0.3 | room: being made | ||
| 14:37:07 | 0.3 | room: up | ||
| 14:37:07 | 0.3 | round: planner | G1 | large model, 43 s, ok, $0.34 |
| 14:37:50 | 1.0 | check: plan format | G1 | green (3 passed, 0 failed) |
| 14:37:50 | 1.0 | plan proposed: goal, features, tasks (titles withheld) | G1 | |
| 14:37:50 | 1.0 | gate one: the plan waits for a decision | ||
| 14:38:38 | 1.8 | approved for me by a Claude session (delegated) | ||
| 14:38:38 | 1.8 | run: queued | ||
| 14:38:41 | 1.9 | room: up | ||
| 14:38:41 | 1.9 | run: running | ||
| 14:40:06 | 3.3 | check: install | G1 | green (1 passed, 0 failed), 1 min 25 s |
| 14:40:06 | 3.3 | round: test writer | G1.F1 | large model, 6 min 34 s, ok, $2.31 |
| 14:46:40 | 9.8 | note from the test writer, for me (text withheld) | G1.F1 | |
| 14:46:40 | 9.8 | note from the test writer, for me (text withheld) | G1.F1 | |
| 14:46:40 | 9.8 | check: acceptance tests written, REQ (id and text withheld)1 | G1.F1 | green (7 passed, 0 failed) |
| 14:46:40 | 9.8 | round: builder | G1.F1.T1 | mid model, 1 min 04 s, ok, $0.20 |
| 14:53:05 | 16.3 | check: task tests2 | G1.F1.T1 | green (24,010 passed, 0 failed), 5 min 21 s |
| 14:53:05 | 16.3 | task frozen: its tests are green | G1.F1.T1 | |
| 14:53:05 | 16.3 | round: builder | G1.F1.T2 | mid model, 45 s, ok, $0.19 |
| 14:58:51 | 22.0 | check: task tests | G1.F1.T2 | green (24,011 passed, 0 failed), 5 min 01 s |
| 14:58:51 | 22.0 | task frozen: its tests are green | G1.F1.T2 | |
| 15:17:25 | 40.6 | check: acceptance tests, REQ (id withheld)3 | G1.F1 | red (24,011 passed, 5 failed), 18 min 34 s |
| 15:22:56 | 46.1 | check: acceptance tests, REQ (id withheld) | G1.F1 | green (24,016 passed, 0 failed), 5 min 31 s |
| 15:22:56 | 46.1 | round: reviewer | G1.F1 | large model, 1 min 22 s, ok, $0.74 |
| 15:24:18 | 47.5 | check: feature review | G1.F1 | red (2 findings) |
| 15:24:18 | 47.5 | question from the review, for me (text withheld) | G1.F1 | |
| 15:24:18 | 47.5 | fix task added from the review (text withheld) | G1.F1.T3 | |
| 15:24:18 | 47.5 | fix task added from the review (text withheld) | G1.F1.T4 | |
| 15:24:18 | 47.5 | round: builder | G1.F1.T3 | mid model, 17 s, ok, $0.06 |
| 15:29:40 | 52.8 | check: task tests | G1.F1.T3 | green (24,011 passed, 0 failed), 5 min 05 s |
| 15:29:40 | 52.8 | task frozen: its tests are green | G1.F1.T3 | |
| 15:29:41 | 52.9 | round: builder | G1.F1.T4 | mid model, 41 s, ok, $0.12 |
| 15:36:22 | 59.5 | check: task tests | G1.F1.T4 | green (24,011 passed, 0 failed), 6 min 00 s |
| 15:36:22 | 59.5 | task frozen: its tests are green | G1.F1.T4 | |
| 15:41:55 | 65.1 | check: acceptance tests, REQ (id withheld) | G1.F1 | green (24,016 passed, 0 failed), 5 min 33 s |
| 15:41:55 | 65.1 | round: reviewer | G1.F1 | large model, 1 min 06 s, ok, $0.57 |
| 15:43:01 | 66.2 | check: feature review | G1.F1 | green (no open finding) |
| 15:43:01 | 66.2 | question from the review, for me (text withheld) | G1.F1 | |
| 15:43:01 | 66.2 | check: full suite, background room4 | red (0 passed, 1 failed) | |
| 15:43:01 | 66.2 | round: blame | G1 | small model, 25 s, ok, $0.01 |
| 15:43:26 | 66.6 | round: blame | G1 | mid model, 14 s, ok, $0.07 |
| 15:44:36 | 67.8 | check: acceptance tests, REQ (id withheld)2 | G1.F1 | green (7 passed, 0 failed), 56 s |
| 15:44:36 | 67.8 | feature passed | G1.F1 | |
| 15:49:52 | 73.0 | check: goal: full suite2 | G1 | green (14 passed, 0 failed), 5 min 16 s |
| 16:04:36 | 87.8 | check: goal: the product's CI | G1 | green (1 passed, 0 failed), 14 min 44 s |
| 16:04:36 | 87.8 | check: full suite, background room4 | red (0 passed, 1 failed) | |
| 16:04:36 | 87.8 | round: blame | G1 | small model, 32 s, ok, $0.01 |
| 16:05:09 | 88.3 | round: blame | G1 | mid model, 14 s, ok, $0.05 |
| 16:05:24 | 88.6 | note: background suite red, blame names no task; the goal check decides4 | G1 | |
| 16:05:24 | 88.6 | round: reviewer | G1 | large model, 42 s, ok, $0.53 |
| 16:06:06 | 89.3 | check: run review5 | G1 | green (no open finding) |
| 16:06:06 | 89.3 | question from the review, for me (text withheld) | G1 | |
| 16:06:06 | 89.3 | goal passed | G1 | |
| 16:06:11 | 89.3 | pull request opened (draft) | ||
| 16:06:11 | 89.3 | gate two: the merge waits for a decision6 | ||
| 16:06:11 | 89.3 | room: being given back | ||
| 16:06:11 | 89.3 | run: waiting at a gate | ||
| 16:06:17 | 89.5 | room: gone | ||
| 16:10:39 | 93.8 | check: full suite, background room4 | red (0 passed, 1 failed) | |
| 16:18:12 | 101.4 | I approved, at a terminal | ||
| 16:18:17 | 101.5 | pull request merged | ||
| 16:18:17 | 101.5 | room: being given back | ||
| 16:18:17 | 101.5 | run: done | stop reason done | |
| 16:18:17 | 101.5 | room: gone |
Notes on the odd lines
- This check is green when each new acceptance test does what it should before any code is written: it fails, unless the test writer declares it already met by today's product and says why. Here 1 of 3 failed, as it must; the other 2 were declared already met (the reasons came to me as the notes just above) and were green. The 7 counts those 3 tests and 4 steps that start and stop the test setup.
- The counts add up a check's commands, not only tests. A step that starts or stops the test setup, a type check or a lint counts as one, each acceptance test as one, and a test command adds the tests it ran. So the first task check's 24,010 is 2 steps and 24,008 product tests; the acceptance check's 24,016 is 4 setup steps, 3 acceptance tests and 24,009 product tests. At 67.8 min the feature had been merged into the run's branch and its acceptance tests ran there once more, alone: 7, that is 4 steps and 3 tests. The goal's full suite shows 14, and that number is wrong. The suite is one command that runs several test runners. The counter only reads Node's built-in test summaries when there are any, and ignores the other runners. Only the design system's lint-rule tests print that format, so it counted their 14 and nothing else. Its log shows 28,108 tests passed in all and none failed. The verdict comes from the command's exit code, so the green was right; only the number is wrong.
- The test setup did not come up for this check, so its 3 acceptance tests could not run: the 5 failed are 2 setup steps and those 3 tests. A red outside the tests says nothing about the code, so the foreman runs the same check once more, without an agent round. The second go, at 46.1 min, was green.
- The background suite runs the product's whole suite in a room of its own, on a plain copy of the code without its git history. 19 product tests and 3 test setups need that history, so the job was red every time, for that reason alone (a job counts as one: 0 passed, 1 failed). Blame found no task to reopen, so the run did not stop: the goal check decides. That check, the same suite on the run's own checkout, was green at 73.0 min, and the product's CI at 87.8 min.
- On 13 November 2026 the run review came after the suite and CI. It comes before them now, so a review fix doesn't pay for the whole suite again.
- On 13 November 2026 gate two was the merge: the pull request waited until I approved it, 12 minutes later. Runs that merge themselves came later.